A mezzanine floor adds a second working level inside a building. It is often the fastest way to gain area when you cannot extend a warehouse, factory or shop. Because people and goods work on it, it needs careful design.
When a mezzanine makes sense
- Your building has generous clear height, such as 5 m or more.
- You need a second floor for storage, packing, assembly or offices.
- Extending or moving would cost more or take longer.
If your building is tall but you only need to store pallets, tall pallet racks may cost less than a mezzanine.
How a mezzanine is built
A steel column grid stands on the existing floor. Primary beams span between columns, secondary beams or joists span between those, and decking sits on top. A staircase gives access, and handrails and toe guards run along the edges. Larger mezzanines add loading gates for pallets.
Design floor load
The floor load, expressed in kilograms per square metre, is the most important design input. Typical values:
| Use | Typical design load |
|---|---|
| Offices, light assembly | About 250 to 300 kg per sq. m |
| Carton and shelf storage | About 500 to 750 kg per sq. m |
| Heavy storage, pallets, machinery | 1,000 kg per sq. m and above |
Tell us what will stand on the floor. Shelving concentrates the weight on the posts, so heavy racks on a mezzanine need to be specified as point loads.
Decking options
- Chequered steel plate: durable and slip-resistant, common in industrial use.
- Board on joists: particle board or similar over steel joists. Economical for storage and offices.
- Steel deck with concrete: for heavier loads and better fire and vibration performance.
Approvals and safety
Requirements depend on the city, the size of the structure, the building's use and its fire safety plan. Consider:
- Whether the local authority or your building owner must approve it
- Fire safety and escape distances, and sprinkler and lighting coverage on both levels
- A structural engineer's design or certificate where required
- Staircases, handrails and pallet gates that meet safety norms
Check these locally before you commit. We can provide drawings and load details for your engineer.
What affects the price
- Area and height
- Design load. Heavier floors need more steel.
- Decking type.
- Staircases, gates and railings.
- Site conditions and access for delivery
- Distance from our Delhi workshop
Information to send us
Floor plan with dimensions, clear height, column positions, floor use, weights of racks or machines to be placed, and where the stair and gate should be. See our mezzanine floors page for typical specifications.
Send us your area, what you store and the weight per pallet or shelf. We will suggest a system and quote.
Get a quote